Finish Work


The contractor's trailer pulls out. leaving
Building the deck and stairs on the east side of the house. deck
Since John and I are doing the painting, all of a sudden we were too busy to actually take pictures of what was happening. Here is the only picture that proves that John, at least, was involved in the painting. painter's hat, painted
The master bedroom after drywall and painting but before the pine ceiling is installed. They put the tub in the middle of the floor to get it out of the way while they were working. master bedroom
The upstairs deck off our master bedroom. A great place to relax. back deck
The downstairs deck off the dining room and the side of the living room. side deck
The garage, all set up to be the painting booth for the wood trim. garage
Some of the pine ceiling boards stacked in the living room on drying racks. pine ceiling boards
The dining room with drywall and paint. Those pipes coming out of the floor mark where the kitchen sink will be installed in a penninsula separating the dining area from the kitchen. dining room